The first three FV4030/2 prototypes were completed by January 1977.īy this time, production of the FV4030/2 was under way at the Royal Ordnance Factory Leeds (since taken over by Vickers Defence Systems) with first production tanks scheduled for delivery in 1980. Excerpts and links may be used, provided that full and clear credit is given to with appropriate and specific direction to the original content.In December 1974, Iran ordered 125 Shir 1 (FV4030/2) and 1,225 Shir 2 (FV4030/3) MBTs but the order was cancelled by the new Iranian government in February 1979. © GDC and Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. ![]() Compared with the Al-Khalid, the first units of which entered service in 2001, the upgrade is comprehensive and appears to be angled at making the design competitive with the Indian Army’s fleet of T-90S MBTs. The Al-Khalid-I is part of a joint venture between Pakistan, China, and Ukraine, and is believed to be intended to replace approximately 300 Type 85 and 320 T-80UD MBTs. During the ceremony Tank Al Khalid-1 displayed (1/5) /3mbqQ5qwxF- DG ISPR July 28, 2020 Tank Al Khalid-1 is joint venture with friendly countries China and Ukraine. COAS was chief guest at the handing over ceremony of Tank Al Khalid-1 to Armoured Corps Regiment. ![]() #COAS visited Heavy Industries Taxila (HIT) today.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |